Heilongjiang Zijin Copper Smelter
Ownership: 100%
Location | Hulan-Ergi District, Qiqihar City, Heilongjiang Province |
Ownership | 100% |
Project status | In operation |
DESIGNED CAPACITY | Cathode copper: 150,000t/a; sulfuric acid: 600,000t/a; gold: 3t/a; silver: 50t/a |
2020 PRODUCTION | Cathode copper: 132,000 tonnes; sulfuric acid: 506,800 tonnes; gold(in anode slime): 1.86 tonnes; silver(in anode slime): 56.90 tonnes |
The smelter operated by Heilongjiang Zijin Copper is a downstream project for the Heilongjiang Duobaoshan Copper Mine.
Performance
Copper Produced
