Zijin Mining Group Co., Ltd. (hereinafter referred to as “Zijin Mining” or “the Company”) adheres to the principles of attaching equal importance to the mineral resources exploitation and ecological environment protection and of "development in the protection and protection in development", and is dedicated to doing a good job of environmental protection and ecological restoration during the whole life cycle of the mine, including mine exploration, design, mining, dressing and smelting, closing of mines, so as to minimize the adverse impacts of the mineral resources development activities on the ecological environment, achieving a high degree of harmony and unity of environmental, social and economic benefits.

The Company has formulated a Policy Statement on Protection of the Ecological Environment to allow all stakeholders to have a clearer understanding of the Zijin Mining's position, commitment and work direction for environmental and ecological protection.

http://www.zijinmining.com/upload/file/2020/09/24/ef0b78ae0ed243a08b313d7437ca5737.pdf

https://www1.hkexnews.hk/listedco/listconews/sehk/2020/0924/2020092401449.pdf

Environment management system

Zijin Mining has established a top-down ESG structure under the leadership of the Company's Board of Directors. The Strategic Committee of the Board of Directors has been added with the corresponding responsibilities of the ESG issues management, under which the ESG committee has been established. There is the establishment of a standardized and professional environmental protection management structure system, consisting of the ESG committee → Headquarters Environmental Protection and Ecology Department → Subsidiaries company.

At the same time, in order to improve the standardized management of each operation point, we actively promote ISO14001 certification, as well as other equivalent environmental management systems in the Company, carry out green production, and build green mines and green factories.



No.

Enterprise name

Environmental management system certification

1

Zijinshan Gold and Copper Mine

It has passed the ISO14001 certification.

2

Wuping Zijin

It has passed the ISO14001 certification.

3

Xinjiang Ashele Copper Industry Co., Ltd.

It has passed the ISO14001 certification.

4

Xinjiang Jinbao Mining Co., Ltd.

It is planned to pass the ISO14001 certification by 2025

5

Xinjiang Zijin Zinc

It is planned to pass the ISO14001 certification by 2021

6

Qinghai West Copper Industry

Considering the life cycle of the mine, ISO14001 certification is not considered for the time being

7

Guizhou Zijin Mining

It is planned to pass the ISO14001 certification by 2024

8

Wenshan Malipo Zijin Tungsten Group

It is planned to pass the ISO14001 certification by 2024

9

Yuanyang Huaxi Gold

It is planned to pass the ISO14001 certification by 2024

10

Longnan Zijin

It is planned to pass the ISO14001 certification by 2023

11

Luoning Huatai

It has passed the ISO14001 certification.

12

Luoyang Kunyu Mining Co., Ltd.

It has passed the ISO14001 certification.

13

Hunchun Zijin

It is planned to pass the ISO14001 certification by 2021

14

Heilongjiang Duobaoshan Copper Industry Inc.

It is planned to pass the ISO14001 certification by 2026

15

Urad Rear Banner Zijin Mining

It has passed the ISO14001 certification.

16

Neimenggu Golden China Minerals Inc.

It is planned to pass the ISO14001 certification by 2021

17

Shanxi Zijin

It has passed the ISO14001 certification.

18

Zijin Copper

It has passed the ISO14001 certification.

19

Jilin Zijin Copper

It has passed the ISO14001 certification.

20

Bayannur Zijin

It has passed the ISO14001 certification.

21

Gold Smelting Co., Ltd.

It has passed the ISO14001 certification.

22

Fujian Zijin Copper

It has passed the ISO14001 certification.

23

Pharmaceutical company

It is planned to pass the ISO14001 certification by 2023

24

Xinjiang Kuitun Tongguan Metallurgical and Chemical Industry

No certification plan has been set yet

25

Luoning Zijin

It has passed the ISO14001 certification.

26

Luoyang Zijin Yinhui

It is planned to pass the ISO14001 certification by 2026

27

Heilongjiang Zijin Copper Co., Ltd.

It is planned to pass the ISO14001 certification by 2022

28

Jinshan High-abrasive Material Co., Ltd.

It is planned to pass the ISO14001 certification by 2026

29

Altynken

It is planned to pass the ISO14001 certification by 2026

30

Longxing

It is planned to pass the ISO14001 certification by 2026

31

COMMUS

It is planned to pass the ISO14001 certification by 2026

32

Norton

It is planned to pass the ISO14001 certification by 2026

33

Zeravshan

It is planned to pass the ISO14001 certification by 2026

34

Serbia Zijin Bor Copper

It has passed the ISO14001 certification.

35

Continental Gold

It has passed the ISO14001 certification.

Environmental Audit

By preparing and implementing the Environmental Protection and Ecological Assessment Management System, the Environmental Protection and Ecological Inspection Management Regulations, the Basic Standards for Environmental Order Management and so on, Zijin Mining conducts regular internal environmental audits on all subsidiaries to ensure that they comply with the local environmental laws and regulations and the requirements of Zijin Mining's environmental management system. Internal audits are conducted once a month for mining and smelting subsidiaries in Mainland China and once a quarter for overseas subsidiaries. And meanwhile, the Company also engages third-party agencies to conduct environmental audits on mining and smelting subsidiaries. By the end of 2019, the Company has achieved that more than 94% of its subsidiaries conducted external audit at least once every three years, and more than 91% of its subsidiaries conducted external audit at least once a year.

Air emission

The main air pollutants generated by mining and smelting activities of Zijin Mining are sulfur dioxide, nitrogen oxides, smoke and dust. The Company continuously monitors the emission level of each operation point through the environmental management system, and implement emission control measures at all operation points to effectively control both organized and unorganized emissions.



Emission intensity of air pollutants in Zijin Mining (t/RMB 100 million revenue)

Type of pollutant

2017

2018

2019

Sulfur dioxide

2.04

1.25

1.01

Nitrogen oxides

1.04

0.826

0.703

In 2020, the Company has set targets for air emissions

Ø By 2030, the emission intensity of sulfur dioxide and nitrogen oxides will be reduced by at least 5% compared with 2020.

Zijin Mining, holding a positive attitude, carries out emission reduction projects concerning the whole Company in order to achieve the targets for 2030 steadily. Under the leadership of the Board of Directors and management team, each operation point shall implement the emission reduction plan according to local conditions. The emission reduction measures of each operation point are as follows:



Overview of emission reduction measures at the operation points of Zijin Mining

No.

Enterprise name

Emission reduction measures

1

Zijinshan Gold and Copper Mine

From June 2018 to April 2019, a set of environmental protection treatment system project with a designed treatment capacity of 30,000 m3/day copper-containing acid water has been built. The treatment process is sulfide neutralization and precipitation. By improving the wastewater treatment capacity and effect, the process control and reduction of heavy metal pollutants have been enhanced. By the end of the "13th Five-Year Plan", heavy metals in Zijinshan Gold and Copper Mine could be reduced by 23% on the basis of 2013.

2

Wuping Zijin

1. In 2017, the three-way intersections among the temporary storage yards, the silver separation workshops and the mining area are provided with a smog nemesis, and watering devices are set on both sides of roads to effectively reduce dust in the storage yards and roads;

2. In 2017, systems with wastewater treatment have been reconstructed from caustic soda to lime neutralization treatment providing better precipitation effect. In 2018, the total copper emissions decreased by 3.04 kg compared with 2017.

3

Xinjiang Ashele Copper Industry Co., Ltd.

The heat exchange stations installed 2 sets of solar water heating systems with an investment of RMB 2.13 million, which greatly reduced the electricity consumption of the electric heating system saving about 1 million kWh per year and indirectly reducing about 80 t/y gaseous pollutants.

4

Xinjiang Jinbao Mining Co., Ltd.

During production and operation process, attention has been paid to waste utilization management, and waste has been reduced by 196,569 t through tailings damming, recycling of discarding tailings and waste rock, paving mining roads with boiler slag in winter, sorted collection of recyclable household waste, etc.

5

Xinjiang Zijin Zinc

1. In 2019, the SNCR denitration device in the boiler room has been reconstructed. After reconstruction, the nitrogen oxide emissions in the first quarter of 2020 decreased by 1.446 t compared with the first quarter of 2019, and the effect of denitrification was significant;

2. Since 2017, the woven bags for ammonium nitrate have been reused, saving 77,000 bags annually and reducing the pollution to the surrounding environment.

6

Qinghai West Copper Industry

West Copper Industry started the coal-to-electricity project for boilers in June 2020 and would achieve zero emission of gas pollutants after reconstruction.

7

Guizhou Zijin Mining

1. Guizhou Zijin started to build an advanced arsenic removal treatment system with a treatment capacity of 25,000 m3/day mine water in April 2018. The system has been put into use since November 2018, and the annual arsenic emission of water pollutants has been reduced by 41.6744 kg;



Overview of emission reduction measures at the operation points of Zijin Mining

No.

Enterprise name

Emission reduction measures



2. Guizhou Zijin started the heightening project for Phases II & III dams of tailings pool in April 2019, using mining waste rock (general solid waste) as damming materials, and comprehensively utilizing mining waste rock (general solid waste) about 400,000 cubic meters;

3. In December 2018, Guizhou Zijin started to build cyanide breaking process system for cyanide tailings. The system would dispose the cyanide tailings, which are hazardous wastes originally, into general solid waste thus reducing the amount of hazardous wastes.

8

Wenshan Malipo Zijin Tungsten Group

Nylon net is set around the overflow tower of the tailings pool to effectively reduce the discharge of suspended solids.

9

Yuanyang Huaxi Gold

Most of the waste rocks generated from underground mining projects are used for backfilling goaf areas. The remaining waste rocks are provided to local residents for building gravel materials and paving roads, so as to make full use of solid wastes and reduce the accumulated amount of waste rock.

10

Longnan Zijin

In 2018, electric boilers have been used for heating, which can reduce 9.6 t sulfur dioxide and 28 t smoke and dust annually.

11

Luoning Huatai

1. The processing dust removers of the second workshop have been reconstructed. And after reconstruction, the dust density decreased from 34 mg/m3 to 23.8 mg/m3;

2. The raw ore storage bins of the two workshops are sealed to effectively suppress the unorganized dust emission;

3. Through technical reconstruction for energy conservation and power saving, as well as air compressor reconstruction for energy conservation, electricity could be saved by 4,090,130 kWh/year.

12

Luoyang Kunyu Mining Co., Ltd.

1. In 2020, a total of 17 portable fog guns has been purchased for dust reduction in waste-rock yards;

2. In July 2020, the roads and unloading platforms of the raw ore storage bin of Wulong processing plant have been hardened to reduce road dust;

3.All mining vehicles are equipped with automatic wind-proof and dust-suppression carports;

4. New washing facilities for incoming and outgoing vehicles have been built; 5. In 2019, the dust removers of Wulong processing plant have been reconstructed. After reconstruction, the dust collection effect has been improved and the organized dust emission has been reduced.

13

Hunchun Zijin

1. In 2018, a desulphurization device has been added to the heating boiler in the mining area. The concentration of sulfur dioxide in the boiler flue gas has been reduced from 400 mg/m3 to about 100 mg/m3, and the emission of sulfur dioxide has reduced by about 17 t;

2. Strictly control the used engine oil generated in the processing plant, conduct protective recycle for the used engine oil generated in the equipment maintenance as much as possible, and reuse it through oil filter. The amount of used engine oil can be reduced by about 5% annually;

3. Turn the waste rocks produced in open pit to useful materials, and treat them as stone resources to reduce the amount of solid waste.



Overview of emission reduction measures at the operation points of Zijin Mining

No.

Enterprise name

Emission reduction measures

14

Heilongjiang Duobaoshan Copper Industry Inc.

By reconstructing the desulphurization and denitration process of boilers since 2018, Duobaoshan Copper Industry Inc. has made its pollutant emission far below the standards, with the emission concentration of sulfur dioxide ≤ 50 mg/standard m3, nitrogen oxides ≤ 200 mg/standard m3 and dust ≤ 30 mg/standard m3. Therefore, the amount of gas pollutants has been reduced greatly.

15

Urad Rear Banner Zijin Mining

The heating project for comprehensive waste heat utilization would be built to replace the original coal-fired boiler, and the annual emission of dust would be reduced by 4.15 t, nitrogen oxides by 12.17 t and sulfur dioxide by 3.93 t.

16

Neimenggu Golden China Minerals Inc.

Neimenggu Golden China Minerals Inc. optimized the mining and stripping plan, and backfilled the pits reducing the amount of solid waste by 1.2 million cubic meters.

17

Shanxi Zijin

1. The excavated waste rocks are used for filling the underground goaf area thus reducing the amount of waste rocks by about 40,000 t annually;

2. In 2018, the 2T coal-fired boiler in the office building of the Company has been replaced with an electric heat storage boiler, reducing sulfur dioxide by 0.43 t, dust by 0.36 t and nitrogen oxides by 0.79 t.

18

Zijin Copper

1. Since 2018, the project of comprehensive utilization and harmless disposal of copper smelting resources has been built. The project is mainly built for mineralization and stabilization of hazardous wastes and arsenic precipitation by ferric arsenate, and comprehensive utilization of copper-containing materials produced by the copper smelting system of the Company for recycling valuable elements such as lead, zinc, copper and bismuth, and reducing the amount of hazardous wastes;

2. In June 2019, the acid-making off-gas reconstruction project has been implemented, and the original dry flue gas desulphurization by activated coke has been replaced by wet flue gas desulphurization by hydrogen peroxide which has effectively improved the desulphurization efficiency of sulfur dioxide in flue gas and reduced the average sulfur dioxide concentration from 200 mg/m3 to 90 mg/m3;

3. In 2020, in order to achieve the target of hazardous waste reduction, a project concerning changing the hazardous waste of telluride copper to smelting by-product as per the national standards has been implemented planning to reduce the amount of hazardous wastes by 200 tons/year;

4. The construction of environmental smoke collection reconstruction project would be completed in December 2020. The existing desulphurization system of environmental smoke collection would be reconstructed to a wet dust remover strengthening washing efficiency and increasing high-efficiency so as to remove the pollutants in flue gas thoroughly. In addition, a set of converter treatment systems adopting environmental smoke collection is added to collect and treat unorganized flue gas which cannot be handled by the existing environmental smoke collection system. The technology of "bag dust removal + sodium-alkali desulphurization + high efficiency wet electrostatic precipitator" is adopted to further reduce unorganized emission.

19

Jilin Zijin Copper

Since 2017, Jilin Zijin Copper Co., Ltd. has been building a fuming acid project to improve the capture rate of sulfur and reduce the emission of sulfur dioxide. The total reduction of sulfur dioxide would reach 19.096 t.



Overview of emission reduction measures at the operation points of Zijin Mining

No.

Enterprise name

Emission reduction measures

20

Bayannur Zijin

1. Bayannur Zijin Co., Ltd. built a new two-residue harmless treatment project. After technical reconstruction, no lead-silver residue, jarosite residue and other hazardous wastes would be produced any longer;

2. In 2018, an advanced waste water treatment project has been built so as to realize full recycling of waste water and reduce the discharge of water pollutants.

21

Gold Smelting Co., Ltd.

Since October 2019, four sets of vacuum spraying systems (caustic soda spraying systems) have been built for waste gas treatment system successively to improve the treatment capacity for waste gas during production process and achieve the emission reduction target.

22

Fujian Zijin Copper

Since 2017, the Company has been paying attention to hazardous waste management during production and operation. By purchasing emulsion treatment equipment and oil extraction equipment for oil-bearing diatomite, the waste emulsion has been reduced by 70%, and the oil-bearing diatomite has been reduced by 15 t annually.

23

Pharmaceutical company

In the project, the distillation and rectification processes of intermediate products have been improved. The remaining part achieves resource utilization as being made into fuel oil by-products, which greatly reduces the amount of distillation residues and the amount of hazardous waste. The average annual reduction reaches more than 40 t.

24

Xinjiang Kuitun Tongguan Metallurgical and Chemical Industry

In 2019, a new electrostatic precipitator has been added to the off-gas sulphuric acid discharge outlet to remove the sodium salt particles generated during sodium-alkali desulphurization, and the emission amount of the particles has reduced by 19.2 t compared with 2018.

25

Luoning Zijin

1. In 2018, an off-gas denitrating tower and a high gas-velocity conductive glass steel electrostatic precipitator are added in the off-gas hydrogen peroxide absorption tower so as to optimize the indexes of nitrogen oxide, particulate matter, acid mist and water in discharged off-gas through compound denitrification agent for denitrification washing and wet electrostatic defogging technology, and eliminate the phenomenon of chimney foaming and steam;

2. In 2018, a cyanide residue harmless treatment project has been built adopting activated carbon leaching process for recovering precious metals, SO2 + O2 oxidation method for eliminating cyanogen, so as to reduce the disposal amount of hazardous wastes.

26

Luoyang Zijin Yinhui

In 2018, a 100-ton gold purification project has five sets of spray towers for environmental protection facilities added, which can reduce the annual emissions of particulate matter and nitrogen oxides by 20% and 10% respectively.

27

Heilongjiang Zijin Copper Co., Ltd.

Hydroelectricity composed tower is adopted in the end treatment facilities of flue gas treatment system, which reduce the emission of sulfur dioxide and dust by spraying caustic soda and electrostatic precipitator, and the emission indexes can meet the requirements of ultra-clean emission.

28

Jinshan High-abrasive Material Co., Ltd.

Since July 2020, the Company upgraded and reconstructed the existing casting line and quenching line with an annual output of 10,000 t to reduce the consumption of coated sand and resin by about two-thirds, and use tap water as the medium directly while eliminating the use of industrial salt as quenching medium thus greatly reducing the amount of waste.



Overview of emission reduction measures at the operation points of Zijin Mining

No.

Enterprise name

Emission reduction measures

29

Altynken

1. The outlet of 2# adit is covered with soil for greening to reduce unorganized dust emission;

2. By sealing the lime mixing station of the mining and processing plants, the dust emission is reduced;

3. In 2020, electric boilers will gradually replace heavy oil boilers to reduce the emission of SO2 and carbon oxides;

4. In 2020, the domestic sewage treatment plant would be reconstructed in order to greatly improve the quality of outlet water and reduce the amount of water pollutants.

30

Longxing

Power plants use the heat of generators for heating, which reduces the consumption of coal. In the past three years, coal consumption has been reduced by about 1,000 t.

31

COMMUS

1. Since 2018, the Company has paid attention to pollutant emission reduction during production and operation, of which sulfur dioxide in smelters has been reduced by 16%;

2. From 2019 to 2020, the topsoil of the northern slope was used as the humus soil for greening of the Company thus reducing emission for 20,000 cubic meters in total;

3. Since June 2020, a contract was signed between the smelter and La Carrière Du Lualaba Société par Actions Simplifiée (Cement Plant) for handling residue extraction of external discharge at an earlier stage. All residue extraction of external discharge would be discharged to the cement plant to realize waste utilization, with a monthly emission reduction of 12,000 t.

32

Norton

1. Since 2014, waste oil has been uniformly recycled and reused to prevent surface pollution and water pollution. The total recycled waste oil is 104 t;

2. By upgrading trucks and introducing high efficient engines in the land mining project, the emission of carbon dioxide and other waste gases can be reduced by 80,000/m3.

33

Zeravshan

In the past 3 years, the Company has contacted the surrounding villages and towns, and the waste rocks stripped from the mining plant are using for building houses of the villagers and laying municipal roads, reducing the emission of solid waste by nearly 120,000 t.

34

Serbia Zijin Bor Copper

Since the acquisition, waste management has been the focus during the production and operation process, pollutant emission has been controlled from the source, qualified units have been entrusted for disposing hazardous wastes, industrial water has been reused, and waste electrolyte treatment system has been built. The total emission was reduced by 480 t.

35

Continental Gold

In 2018 and 2019, it signed an agreement with ECONCIENCIA (a local garbage recycling company) to process recyclable garbage into plastic wood. The garbage had been processed in the garbage dump in Platanal.

Solid wastes management

Zijin Mining strictly follows the Law on Prevention and Control of Environmental Pollution by Solid Wastes, the Standard for Pollution Control on the Storage and Disposal Site for General Industrial Solid Wastes and the Standard for Pollution Control on the Security Landfill Site for Hazardous Wastes in China as well as the laws and regulations of the countries (regions) where overseas ownership enterprises are located, pays attention to waste management during the production and operation, selects raw materials with low harm, low toxicity and less waste from the source, optimizes the process by improving design and operating conditions, improves the conversion rate of raw materials and product output rate, and maximizes the recycling of resources at the end, so as to reduce the generation of the waste.

In 2020, the Company formulated solid waste management targets  

Ø By 2030, the comprehensive utilization rate of non-hazardous wastes will increase by 5% compared with 2020.  



Comprehensive utilization rate of non-hazardous wastes in Zijin Mining

Types of non-hazardous wastes

2019

Tailings

19.14%

Waste rock

15.26%

In order to steadily achieve the goal of 2030, each operation point, under the leadership of the Board of Directors and management team, implements the comprehensive utilization plan of non-hazardous wastes according to local conditions. For details, please refer to "Overview of Emission Reduction Measures of Operation Point in Zijin Mining".

Water resources management

Access to safe and hygienic water resources is not only a basic human right, but also an important resource for mining and processing. Zijin Mining Group Co., Ltd. (hereinafter referred to as "Zijin Mining" or "the Company") has been committed to responsible water resources management. In the process of production and operation, the Company continuously optimizes water resources management, improves water resources utilization rate and reduces the negative impact of enterprises on local water resources. The Company has formulated the Statement on Water Resources Management Policies of Zijin Mining to allow all stakeholders to have a clearer understanding of the Company's position, commitment and work direction for water resources protection.

http://www.zijinmining.com/upload/file/2020/09/24/cd2596b9f9e14429a01563f7e2250a08.pdf

https://www1.hkexnews.hk/listedco/listconews/sehk/2020/0924/2020092401503.pdf

Water resources risk assessment

In order to effectively identify and assess the water resources risk of the place where it operates and its impact on the business of the Company, we conduct water resources risk assessment with mainstream standards, so as to support the planning and implementation of water conservation projects.

As of the end of 2019, the water resources risk assessment project carried out by the Company has covered all operation points under its subsidiaries.

In the future, the Company will continue to pay attention to the water resources risk management standards and tools of the industry, and consider cooperating with or World Wildlife Fund (WWF), World Resources Institute (WRI) and other institutions to continuously improve water resources risk management.

Water consumption target

In 2020, the Company has set a target for water consumption

Ø By 2030, water consumption intensity from operation shall reduced by 10%, compared to 2019.



Year

2019

Water consumption intensity (tonnes per RMB10,000 of operating income)

2.96

Water efficiency programs

In order to gradually reduce the water consumption intensity towards the 2030 target, the Company implemented targeted water conservation measures at all operation points to effectively control the use of water resources. The water conservation measures of each operation point are as follows:



Overview of Water Conservation Measures of Zijin Mining

No.

Enterprise name

Water conservation measures

1

Zijinshan Gold and Copper Mine

1. About 5.8 million cubic meters of clean water can be saved every year by reusing the tailing water;

2.About 1 million cubic meters of clean water can be saved every year by recycling the water treated by environmental protection treatment system

2

Wuping Zijin

1. 15 new water meters will be added in 2019 to effectively monitor water consumption and accidental loss;

2.In the processing plant, part of cooling and dedusting water is changed into industrial water, and the spraying water for road dust reduction is changed into circulating water;

3. Since July 2018, the water consumption and domestic water consumption of Tingjiang River have decreased significantly, and the average water intake from Tingjiang River has decreased by 5,500 tons / month.

3

Xinjiang Ashele Copper Industry Co., Ltd.

The return water from tailings pool is recycled in the grinding-floating workshop of processing plant through return water pump house and high-level reservoir, which can save 2.52 million cubic meters of new water every year.

4

Xinjiang Jinbao Mining Co., Ltd.

In the production and operation process, Xinjiang Jinbao Mining Co., Ltd. pays attention to the management of waste water recycling. After treatment, the water inflow of pit and domestic sewage can be reused in the production system, saving 3,264,657 liters of water.

5

Xinjiang Zijin Zinc

1. The transformation project of domestic sewage treatment system was completed in 2018. After upgrading, the daily treatment of domestic sewage was 120 m3. Part of the water after reaching the standard was put into the production system, and part of the water was sprinkled for dust reduction in the mining area, saving about 39,600 cubic meters of new water annually;

2. In 2018, three sets of 110 m3/h water suction pumps were replaced with 220 m3/h pumps in the tailings pool, which increased the recycling amount of waste water in tailings pool and reduced the utilization of new water. In this way, the annual utilization of return water was about 1.44 million cubic meters;

3. The cooling system transformation of diaphragm pump reducer in the processing plant was completed in 2018. The original end-flow heat exchanger cooling system and the watering and cooling measures for the shell were changed to a cooling fan installed outside the reducer, saving about 3,200 m3 of water annually;

4. The transformation of spray irrigation and drip irrigation water conservation project in the mining area was completed in 2019, saving about 800 m3 of water annually;

6

Qinghai West Copper Industry

The water inflow from the mining is sprinkled for dust reduction of main roads in the mining area, and used for greening and irrigation in the slope, so as to reduce the use of new water.

7

Guizhou Zijin Mining

The domestic sewage in the mining area of Shuiyindong Gold Mine of Guizhou Zijin Mining Co., Ltd. is reused for production after treatment, saving 18,250 tons of water annually.

8

Wenshan Malipo Zijin Tungsten Group

The waste water from office area and living area will be collected and treated in a unified way through the construction of domestic sewage treatment station. The treated waste water can be used for plant greening and fertilization after reaching the water greening standard of comprehensive sewage discharge, so as to save the use of new water.

9

Yuanyang Huaxi Gold

The clarified water in tailings pool is recycled and reused for processing technology, which greatly reduces the fresh water consumption of the processing plant.

10

Longnan Zijin

In 2020, the initial rainwater collection system is built in the processing plant, which can fully reuse the initial rainwater, and it is estimated that 20,000 m3 of water will be saved every year.

11

Luoning Huatai

1. The mine water should be fully collected and used as water for living according to the needs, so as to reduce the new water supply of domestic water;

2. After being treated by the treatment facilities, the domestic sewage is settled and collected together with the surplus pit waste water. According to the surrounding terrain, the sewage is transported by power and used for dust reduction of roads and slag disposal areas.

12

Luoyang Kunyu Mining Co., Ltd.

The domestic sewage treatment system constructed in 2019 can be reused for production and sprinkling water for dust reduction, saving 300 tons/year.

13

Hunchun Zijin

1. 2 # tailings pool and 6 #, 7 # drainage shafts are installed with return water pipeline, which is directly introduced into the processing plant through the elevation difference. The tailings pool water is returned to the processing plant through the height difference self-pressure for reuse, saving 13 million cubic meters of water annually;

2. The leaching water in north mountain open-pit and waste dump are recycled, and the return water pipeline is constructed, with a total available amount of about 1 million cubic meters every year.

14

Heilongjiang Duobaoshan Copper Industry Inc.

In 2020, Duobaoshan Copper Industry Inc. pumps water from the bottom of the mining area into the reservoir with the capacity of 20,000 m3 for production projects, saving 912,000 m3 of water.

15

Urad Rear Banner Zijin Mining

The drainage water treatment system was built in 2018 to treat mine water for cooling water in the processing plant and grouting and water blocking supply, saving about 3,000 m3 of water per day.

16

Neimenggu Golden China Minerals Inc.

1. The greening irrigation system is transformed into drip irrigation micro-spray system, saving 250,00 m3 of water;

2. The domestic waste water after treatment is reused in the production system, saving 58,000 m3 of water every year.

17

Shanxi Zijin

About 1 million tons of fresh water will be reduced every year through the waste water recycling system.

18

Zijin Copper

1. The overflow water from the water-jet box of the power plant was recovered and transformed in 2017. After calculation, about 150 m3 of industrial water can be recycled every day, and about 50,000 m3  of industrial water can be saved in the whole year;

2. Since 2020, the Company began to implement water balance special assessment and water balance water conservation measures, strictly control the amount of waste water entering the water treatment station, reduce the cost of water treatment, and it is estimated that 67,560 tons/year of waste water will be reduced and 26,400 tons/year of new water will be saved.

19

Jilin Zijin Copper

1. In 2017, 7,300 m3 of new water were saved every year through the recycling of cooling water of the circulating pump in the electrolytic plant;

2. In 2017, 15,000 m3 of production water were saved every year through the project of recycling waste water from neutralization tank of demineralized water station to smelting water quenching pool;

3. In 2017, 5,400 m3 of demineralized water were saved in the power plant through the condensate recovery project of heat exchanger in the demineralized water station;

4. In 2018, 144,000 m3 of production water were saved every year through the project of recycling the water from the waste heat generation water-jet box to the raw water tank of the demineralized water station;

5. In 2019, 24,727 m3 of water were saved in the acid plant through the project of reducing circulating water discharge with internal recycling;

6. In 2018, 7,500 liters of water were saved every year by changing the delayed flushing valve of urinals in office areas to inductive flushing valves;

7. In 2019, 35,000 m3 of production water were saved every year through the project of recycling concentrated water from concentrated water tank of demineralized water station to power circulating pool;

8. In 2019, about 11,550 m3 of the recycling boiler external discharge were saved every year by recycling the boiler external discharge for the use of circulating water system of anode furnace disc casting and slag flushing of side blown furnace;

9. In 2019, the annual water recovery and utilization of side blown furnace was about 3,900 m3 by reusing water in the rainwater collection pool for slag flushing water of side blown furnace;

20

Bayannur Zijin

1. In 2018, the advanced waste water treatment project was constructed to realize the recycling of all waste water and reduce the use of new water;

2. In 2019, Bayannur Zijin Non-ferrous Metals Co., Ltd. effectively saved the production water of the Company through the water conservation transformation project of "diverting waste water from clean water".

21

Gold Smelting Co., Ltd.

1. Reduce water consumption by changing the diameter of tap;

2. Collect the cooling water for air conditioning for mopping the floor;

3. Collect the MVR condensate in environmental protection workshop for secondary aqua regia reduction to improve the production process;

4. Collect the cooling water of the chiller in ingot refining workshop of refining plant for cooling gold ingot.

22

Fujian Zijin Copper

In 2018, the water conservation transformation of the production line was carried out, and the use of water-saving appliances was promoted, with total water saving of 3,893 tons. The second batch of water conservation enterprises in Fujian Province was approved on December 31, 2019.

23

Pharmaceutical company

Clean water such as steam condensate and jacket cooling water of reactor is reused in the production system as hydrolysis water in production, which saves more than 1,000 tons of tap water every year.

24

Xinjiang Kuitun Tongguan Metallurgical and Chemical Industry

The Company's wastewater treatment workshop added with a wastewater treatment process in 2019, to realize the reuse of all production wastewater.

25

Luoning Zijin

1. All production waste water is reused for production;

2. Domestic waste water is reused for greening and watering.

26

Luoyang Zijin Yinhui

From May 2018, the reclaimed water generated by the water purifier in Luoning Project will be stored and used for daily road sprinkling of the sprinkler of Luoning Zijin Gold Refinery Co., Ltd., which can save new water consumption.

27

Heilongjiang Zijin Copper Co., Ltd.

In 2019, the advanced demineralization facilities were provided in Heilongjiang Zijin Copper Co., Ltd. The treated water can meet the water quality requirements of circulating make-up water, and the remaining concentrated water will be used for slag selection, saving 280 m3 of new water every day.

28

Jinshan High-abrasive Material Co., Ltd.

The production of the workshop adopts the recycling water method. This can save about 28,000 tons of water throughout the year.

29

Altynken

The production of the workshop adopts the recycling water method, which can save about 28,000 tons of water throughout the year.

1. In the processing plant, except for equipment cooling water (which has high requirements for water quality), the rest are return water from tailings pool. The annual return water rate is 93.92%, and the annual used return water is 2,462,364 m3;

2. Reduce the consumption of domestic water by changing manual flushing in the toilet to infrared identification.

30

Longxing

1. About 1 million cubic meters of clean water can be saved every year by reusing the tailing water;

2. About 5,000 m3 of clean water can be saved every year by recycling the treated pit sewage.

31

COMMUS

About 600 m3 of water can be saved every month through the recycling system of power wave waste water in smelter.

32

Norton

Since 2017, the water conservation system has been implemented that uses safe waste water and underground discharge water for car washing and then rinses with clean water, with a total water saving of 486,000 liters.

33

Zeravshan

1. In the tailings reservoir area, through the construction and improvement of the water recycling system of the mineral processing tailings, the tailings can be reused to the maximum extent, and 374,400 tons of new water is saved in the past 3 years.

2. In 2019, Jilau Mining Plant saved 672,000 tons of water by collecting rain and snow catchment water in the valley and reuse of rock fissure water.

34

Serbia Zijin Bor Copper

1. Industrial reuse of underground pit water in JM mine saves 4,000 m3 of water per day; 2 VK0# tailings pool industrial water reuse project.

35

Continental Gold

1. Since 2017, the Company has adopted a number of water-saving measures, including: installing water-saving devices on all faucets within the Company; monitoring the daily flow rate of all water collection tanks within the Company; checking the water system weekly to reduce water leakage (If a problem is found, the problem is solved promptly); promoting the concept of water saving to employees and contractors;

2. In 2020, CG-GS-SGA-PR-005 high efficiency water and water conservation project was carried out.

Ecological environment protection and land use

Zijin Mining insists on intensive land use, minimizes land disturbance, effectively manages land resources, and controls mine geological disasters, water and soil erosion, and so on. In addition, Zijin Mining integrates land reclamation and ecological restoration in mining areas throughout every aspect of mining activities. Based on the technical characteristics of different mining periods and natural environment factors, Zijin Mining formulates and timely adjusts the reclamation and ecological restoration planning schemes at all project operation points. These measures cover all operation points under the ownership enterprises.

In 2020, the Company established targets of ecological environment protection

Ø By 2030, all operation points will formulate and implement biodiversity protection plans.

Ø In each fiscal year, realize zero environmental emergencies and zero ecological damage events.

Ecosystem protection programs

The mining and smelting activities of the Company will affect the local ecological environment. The Company has implemented targeted ecological protection measures in all operation points. The list of ecological environmental protection measures of each operation point is as follows:



Overview of Biodiversity Protection Measures of Zijin Mining

No.

Enterprise name

Protective measures for ecological environment

1

Zijinshan Gold and Copper Mine

From 2018 to the end of July 2020, Zijinshan Gold and Copper Mine mainly carried out vegetation greening on the side slope of gold mine residue storage yard and copper mine storage yard and the end area of waste dump, and beautified the areas on both sides of the main road in the mining area. During the period, about 430,000 seedlings were planted, and the greening restoration area was 2,819.81 mu.

2

Wuping Zijin

1. In 2017, the area of vegetation restoration was 35,000 square meters, including 34,000 square meters of grass seed sowed, 3,700 square meters of Manila turf, and 500 masson pines;

2. In 2018, the vegetation restoration area was 17,750 square meters, and 1,550 masson pines were planted;

3. In 2019, 8,000 masson pines were planted on the platform of 280 of waste dump, and the vegetation restoration area was 18,464 square meters.

3

Xinjiang Ashele Copper Industry Co., Ltd.

In 2018, more than 20,000 trees were planted in the tailings dam. Both sides of greening road were extended 6 km to the direction of Habahe County, and nearly 20,000 poplars were planted.

4

Xinjiang Jinbao Mining Co., Ltd.

From 2017 to 2019, Xinjiang Jinbao Mining Co., Ltd. planted 24,668 trees with 6,651 kg grass seeds.

5

Xinjiang Zijin Zinc

1. In 2018, 190 thousand square meters of ecological reclamation was completed in the original 1# oxidized ore yard and the surrounding green area of the processing plant. 13,380 flowers and trees for 7 species were planted, and 3,600 kg grass seeds for 3 species were sown, with a survival rate of 80%;

2. In 2019, about 4,480 square meters of ecological reclamation was completed in the office area, vehicle repair plant and roads leading to the processing plant. 10,200 flowers and trees for 10 species were planted, with a survival rate of 85%;

3. In 2020, 15,900 square meters of ecological reclamation was completed in the mining area, with 10,235 trees planted for one species, and 5,800 square meters of lawn greening in the living area, of which the survival rate reached 85%.  

6

Qinghai West Copper Industry

1. In 2018, a total of 117,200 square meters of greening area, 500,000 square meters of mining area beautifying and 10,000 square meters of replanting were completed;

2. In 2019, the original landform exposed seeding area of the north side slope of the stope weight house was 27,800 square meters, and the covering soil green area of the south side slope of the west waste dump 4230 platform was 9,000 square meters. The beautification and replanting area of the surrounding area around the 80 meter thick pool in the mining area, the platform before copper preparation and the mining area was about 10,000 square meters;

3. In 2020, the ecological restoration improvement scheme is mainly for the greening projects of tailings pool, north side slope of slag retaining dam and waste dump, and the green area with poor growth is maintained and fertilized.

7

Guizhou Zijin Mining

1. In 2018, 15,000 mucuna sempervirens were planted around the tailings pool;

2. In 2019, the ecological environment of the mine water treatment side slope was restored with a total of 25,000 cubic meters/day, where 200 pines, 50 purple leaf plums, 80 osmanthuses, 20 waxberries were planted, and 150 kg grass seeds were sowed;  

3. In 2019, the ecological restoration of the main shaft side slope in Changtian mining area was carried out, and 1,650 trees for 3 species were planted;

4. In 2019, the ecological restoration beside the paste was carried out, and 150 trees for 5 species were planted;

5. In 2020, the ecological restoration of tailings pool was carried out, and 490 trees for 2 species were planted and 600 kg of grass seeds were sowed;

6. In 2020, the ecological restoration of No.3 air shaft was carried out, and 500 kg of grass seeds were sowed.

7. The ecological restoration of No.2 slag dump was carried out, and 364 colored red poplars were planted.

8

Wenshan Malipo Zijin Tungsten Group

1. The temporary construction project shall be covered with soil and afforested in time after completion;

2. In the past three years, 13,000 flowers and trees have been planted, with a soil covering green area of 37,000 square meters.

9

Yuanyang Huaxi Gold

Descend the slope, cover soil, plant trees for greening in the slagging yard and temporary slag dump of adit with a total of 15,360 square meters of covering soil and 15,080 trees.

10

Longnan Zijin

1. In 2018, 350 willows, 50 cherry blossom trees, 13,000 locusts, 214 mongolicas, 2,787 spruces, 12,000 wild peppers, 10,800 larches, 39,750 Chinese pines, and 7,000 Armand pines were planted, and 1,500 kg clover seeds, 2,000 kg wheat seeds, 7,000 kg alfalfa seeds and 1,000 kg rape seeds were sowed, with a restoration and management area of 890 mu;

2. In 2019, 26,660 spruces, 313,903 Armand pines, 234,540 Chinese pines, 35,944 larches, 89,100 locusts, 10,200 paper mulberry trees, and 1,100 boston ivies were planted, and 19,575 kg alfalfa seeds, 102,990 kg wheat seeds, 326 kg tall fescue seeds, 1,060 kg coreopsis seeds, 826 kg ryegrass seeds, 1,250 kg amorpha fruticosa seeds, 826 kg bermuda grass seeds and 500 kg locust seeds were sowed. Hanging net guniting 124,000 square meters, plain spraying 31,200 square meters, restoration and management of 3,346 mu (9,379.8 mu in total) and investment of RMB 30.82 million (total investment of RMB 110 million);

3. In 2020, 24,676 Chinese pines and 12,650 locusts were planted. The mining plant has organized about 29,000 square meters of hanging net guniting, 67,600 square meters of plain spraying, and 736 mu of restoration and management.

11

Luoning Huatai

Soil covering and green planting shall be carried out for the slag slope which is not in use, where more than 9,000 new locusts and amorpha fruticosa were planted respectively. In recent three years, 1,150 mu of vegetation ares has been restored.

12

Luoyang Kunyu Mining Co., Ltd.

Up to now, a total of 146 waste rock and slag yards have been restored and treated, with more than 40,000 various seedlings planted and 1,030 mu of vegetation restored, accounting for 95% of the total area; At the same time, more than RMB 600,000 has been invested in the overall planning and greening of the living area and office area of Shanggong and Wulong Mining Department. 3,500 trees, shrubs and herbaceous plants, such as Buxus sinica, ginkgo biloba and lawn, have been planted. The green area of the mining area has reached 6,500 square meters, and the ecological environment of the mining area has been significantly improved; From March to April in 2020, we organized personnel from all departments to carry out tree planting activities in Diaoya shaft, 870 and 908 pitheads, 47 line large shaft, Cilenggou tailings pool and other industrial sites and slag slopes, and planted more than 10,000 locusts.

13

Hunchun Zijin

1. Collect the topsoil from the cutting area of waste dump and 2# and 3# tailings pool, clear and transport the topsoil, and store it orderly for ecological environment restoration and land reclamation after later mine comparison. From 2018 to 2020, a total of 600,000 cubic meters of topsoil was collected and stockpiled in an orderly manner. Meanwhile, 4 temporary topsoil storage yards were planted with grass to prevent dust emission;

2. From 2017 to 2020, expansion of open-pit mine of the 530 m waste dump, 2# waste dump, 655 and 590 platforms of 1# waste dump, 580 waste dump and retaining wall of mining road were covered with soil for greening, with an additional green area of 215,450 square meters.

14

Heilongjiang Duobaoshan Copper Industry Inc.

1. In 2018, Duobaoshan Copper Mine carried out soil covering greening and water and soil conservation for the storage yard and waste dump, with a green area of 128,000 square meters;

2. In 2020, Duobaoshan Copper Mine established Tongshan mine botanical garden to protect the local ecology, planting more than 830 trees for 6 species, sowing grass seeds and laying more than 43,000 square meters of turf.

15

Urad Rear Banner Zijin Mining

From 2017 to 2019, vegetation restoration and greening were carried out in the mining area and surrounding areas, with a total of 100,000 square meters of new green areas and more than 5,000 trees planted.

16

Neimenggu Golden China Minerals Inc.

From 2018 to 2020, Neimenggu Golden China Minerals Inc. planted more than 3,000 elms and 2,300 Pinus sylvestrises in the mining area, and 190,000 square meters of the grass seeds were sowed for restoration and management of the tailings pool.

17

Shanxi Zijin

1. In 2018, 41,000 square meters of soil was covered around the mining area and 3,000 trees were planted;

2. In 2019, the slag slope was covered with 31,670 square meters of soil, and 842 trees, 1,031 flowers and trees and 625 square meters of grass were planted; 3. In 2020, 1,260 trees were planted, with 2,635 square meters of grass planted on the slag slope.

18

Zijin Copper

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. In recent three years, 16 thornless horned holly balls, 31 photinia fraseri balls, 8 camellias and 4,580 masson pines have been planted in the plant area; A total of 223 citrus reiculata Blancos, orange trees and honey peaches have been planted around the filtrate collection tank of the harmless landfill. 21 camphors, 94 camellias, 24 rhododendron balls, 20 cycas revolutas, 198 photinia fraseri balls, 57 thornless horned holly balls, 38 Lorpetalum chindensevar.rubrums, 89 red Ficus microcarpas and 89 Bauhinia variegata with red flowers were planted in the harmless plant area.

19

Jilin Zijin Copper

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. Since 2015, a total of 97,000 square meters of vegetation has been restored.

20

Bayannur Zijin

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. At present, the green area of the whole plant is about 300,000 square meters. Since 2018, 1,160 new arbors have been planted, and the newly added green area is about 20,000 square meters.

21

Gold Smelting Co., Ltd.

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. Gold Smelting Co., Ltd. has established a botanical garden in 2019 to protect the local ecological environment. 280 newly planted trees for 8 species (mango trees, banyan trees, osmanthus, bougainvillea, Japanese hibiscus, safflower, Duranta repens and cycas) were planted.

22

Fujian Zijin Copper

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. In 2020, we will carry out the environmental greening improvement project on the basis of the original greening, with a lawn planting area of 4,200 square meters and more than 400 trees and shrubs planted.

23

Pharmaceutical company

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. In recent two years, the greening plant area is more than 10,000 square meters, accounting for nearly one third of the plant area, with 200 camphor trees and 100 other shrubs planted.

24

Xinjiang Kuitun Tongguan Metallurgical and Chemical Industry

Located in the industrial park, it is mainly for plant greening. In recent 3 years, more than 1,700 trees have been planted in the plant with a green area of 6,800 square meters.

25

Luoning Zijin

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. In 2018, a total of RMB 403,000 was invested in planting 1,702 Sabina chinensis, 10,307 photinia fraserises, 23,232 iris tectorums, 2,112 Chinese roses, 87 cedars, 195 Buxus sinicas, 15,527 euonymus japonicuses, and lawn planting, with a green area of 11,450 square meters. In 2019, RMB 141,000 was invested to complete the supplementary planting work inside and outside the plant area, including 60 French holly trees, 2,000 Boston ivies, 2,000 photinia fraserises, and 3,800 square meters of lawn.

26

Luoyang Zijin Yinhui

The Project shares the same plant area with Luoning Zijin, which mainly plants grasses and trees around the plant for greening.

27

Heilongjiang Zijin Copper Co., Ltd.

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. In 2019, arbors of greening tree species: 35 picea wilsoniis, 55 white birches, 45 acer monoes, and 17 sorbs; shrubs of greening tree species: 150 elms, 282 flowering plums, 150 syringa reticulatas, 150 lilacs, 150 forsythia suspensas and 150 cornus albas; green lawn area was 3,189 square meters.

28

Jinshan High-abrasive Material Co., Ltd.

Located in the industrial park, it mainly focuses on the ecological environment protection in the plant area. In 2018, the Company invested nearly RMB 300,000 to carry out greening and beautification work for the plant area, with the green area of about 4,800 square meters, and the greening rate of 19.1%; In the first half of 2020, the Company invested nearly RMB 50,000 to plant 45 new green trees (large) with the restoration green area of about 190 square meters.

29

Altynken

1. In 2019, a green barrier for 2# adit of the mining plant was established, 200 large pine trees were planted, and the soil covering area for greening was 6,000 square meters to reduce dust; More than 1,200 landscape seedlings were planted around the sidewalk; Seedlings were planted in the staff's house and birch and flowers were planted along the main road side, with a total of 400 trees and 15,000 flowers, covering a restoration area of 21,600 square meters;

2. In 2020, an orchard will be established, 600 fruit trees of various types will be planted, and an area of 15,000 square meters will be restored.

30

Longxing

The Company has completed the soil covering and greening work on the exposed site of the office area and the dam surface of the tailings pool. It has leveled the vacant area of the mining area for greening and planted trees and grasses around the roads. In the past three years, RMB 151,000 has been invested in planting grass seed in the mining area, and 20,000 square meters of land has been afforested, with a total of 3,000 trees planted.

31

COMMUS

In 2018, various plants were planted in the living area and plant area. From December 2019 to March 2020, wild chrysanthemum and turf were planted in 1# waste dump about 50,000 square meters. More than 35,000 grass seeds were sowed on the side slope of tailings pool. More than 300 banana trees and other local trees were planted in processing plant, smelting plant and hydrometallurgical plant. In the second half of 2020, greening will be carried out in the remaining areas of 2# and 1# waste dumps.

32

Norton

Biodiversity testing and noise studies will be carried out on the Binduli Project to reduce or eradicate the impact to local biota.

33

Zeravshan

In the past three years, the Company has planted trees and grasses in Jilau mining plant, Taluo mining plant, 1# and 2# processing plants, tailings pool, both sides of mining road, old golf course and Chinese camp. So far, more than 9,500 seedlings of cherry, Naili, Chinese rose and poplar have been planted; Grasses for livestock have been planted in tailings dam, and the restoration green area of the production and living areas, such as two mining plants, Chinese camp and processing plant has been 68,000 square meters.

34

Serbia Zijin Bor Copper

Serbia Zijin Bor Copper has recovered vegetation in the mining area. After the acquisition, it has completed vegetation restoration area of 248,000 m2 and planted 56,900 flowers and trees of all kinds.

35

Continental Gold

1. Since 2017, the following projects have been implemented under the environmental protection agreement of the environmental services payment plan:

1) The Las Alegrias National Park corridor with an area of 409 hectares benefits 8 families;

2) The 463 hectares of forest around Buriticá Project benefits 60 families;

3) The 979 hectares of Pacific Forest Reserve benefits 75 families.

2. From 2018 to 2019, we defined the characteristics of the feline population around the project, and approved the action plan for the protection of feline animals in the area, especially the small tiger cat in the List of Union for Conservation of Nature;

3. A tree planting festival was organized with local environmental agencies and about 5,000 local trees were planted.

The Company actively cooperates with external stakeholders to implement the concept of sustainable development.

The Sustainable Development Association that Zijin Mining has joined:

Ø Zijinshan Gold and Copper Mine joined Fujian Mining Association

Ø Xinjiang Ashele Copper Industry Co., Ltd. joined Xinjiang Mining Federation

Ø Guizhou Zijin joined China Mining Association

Ø Duobaoshan Copper Industry Inc. joined China Environmental Council

Ø Zijin Mining joined China Nonferrous Metals Industry Association

Ø Columbia Continental Gold Inc. joined Corpourabá (sustainable development agency), Mas Bosques (non-profit organization dedicated to sustainable development) and Portafolio Verde (private organization dedicated to sustainable development)

List of universities cooperating with Zijin Mining:

Ø Fujian Agriculture and Forestry University, Fuzhou University, Xiamen University, Longyan University, Qinghai University, Northeast Forestry University, Central South University and Beijing University of Chemical Technology