2022H1
Investors
Investors
2022H1 Highlights
Financial Performance
  • Return on Equity
    The ROE for H1 2022 is 16.62%, up by 5.58 percentage point year-on-year.
  • Earning Per Share
    The EPS for H1 2022 stands at $7.4 cents, up by 83% year-on-year.
Main Mineral Products
Main Mines/Companies

Cu

Main Operations

(Click to download the excel file)

Operations Equity Interest Held by the Group Mined Copper (tonne) Attributable Mined Copper (tonne) Remarks
COMMUS of the DRC 72% 64,168 46,201 38,340 tonnes of  copper cathode(produced through electrowinning)
Duobaoshan Copper 100% 57,029 57,029
Kamoa Copper 39.6% 56,595 56,595 Zijin owns a 13.65% stake in Ivanhoe Mines, thus having 64,320 tonnes of combined attributable mined copper.
Serbia Zijin Mining 100% 52,755 52,755
Zijinshan Gold and Copper Mine 100% 46,339 46,339 12,479 tonnes of copper cathode(produced through electrowinning)
Serbia Zijin Copper 63% 44,656 28,133 24,665 tonnes of copper cathode (extracted from metal-containing slime)
Julong Copper 50.1% 43,762 21,925
Ashele Copper 51% 23,244 11,855
Bisha Mining of Eritrea 55% 9,226 5,074
Hunchun Zijin Mining 100% 6,641 6,641
Other Mines Combined 5,775 4,748
Total 410,190 337,294


Au

Main Operations

(Click to download the excel file)

Operations Equity Interest Held by the Group Mined Gold (1,000 ounces) Attributable Mined Gold (1,000 ounces)
Buriticá Gold Mine 69.28% 120 83
JV Zeravshan LLC of Tajikistan 70.00% 109 76
Longnan Zijin Mining 84.22% 88 74
Norton Gold Fields 100% 84 84
Serbia Zijin Mining 100% 82 82
Altynken LLC of Kyrghyzstan 60% 43 26
Duobaoshan Copper 100% 43 43
Guizhou Zijin Mining 56% 43 24
Serbia Zijin Copper 63% 40 25
Aurora Gold Mine 100% 40 40
Luoyang Kunyu Mining 70% 39 28
Hunchun Zijin Mining 100% 38 38
Zijinshan Gold and Copper Mine 100% 35 35
Other Mines Combined 65 52
Total 869 709


Zn/Pb

Main Operations

(Click to download the excel file)

Operations Equity Interest Held by the Group Mined Zinc (tonne) Mined Lead (tonne) Mined Zinc + Lead (tonne) Attributable Mined Zinc + Lead (tonne)
Xinjiang Zijin Zinc 100% 66,760 9116 75,875 75,875
Bisha Mining of Eritrea 55% 62,965
62,965 34,631
Longxing LLC of Russia 70% 42,793 3,177 45,969 32,179
Urad Rear Banner Zijin 95% 24,285 5,171 29,456 27,983
Ashele Copper 51% 5,351
5,351 2,729
Other Mines Combined 563 1866 2,429 2,268
Total 202,716 19,329 222,046 175,664


Ag

Main Operations

(Click to download the excel file)

Operations Equity Interest Held by the Group Mined Silver (1,000 ounces) Attributable Mined Silver (1,000 ounces)
Julong Copper 50.10% 864 433
Bisha Mining of Eritrea 55% 830 456
Duobaoshan Copper 100% 666 666
Luoyang Kunyu Mining 70% 636 445
Shanxi Zijin 100% 509 509
Zijinshan Gold and Copper Mine 100% 472 472
Ashele Copper 51% 460 235
Longxing LLC of Russia 70.00% 441 309
Other Mines Combined 1,025 738
Total 5,903 4,263


Fe

Main Operations

(Click to download the excel file)

Operations Equity Interest Held by the Group Iron Concentrates (10,000 tonnes) Attributable Iron Concentrates (10,000 tonnes)
Xinjiang Jinbao 56% 120 67
Makeng Mining 41.50% 50 (attributable) 50
Other Mines Combined 4 2
Total 174 119
Renewable Energy and Clean Energy

Li

Main Operations

(Click to download the excel file)

Operations LCE Resources Production Guidance
3Q Lithium Salar in Argentina 7.63 million tonnes (lithium ion concentration at 400mg/L cut-off) Phase 1 is designed to produce 20,000 tonnes of battery-grade lithium carbonate per annum, with its commissioning scheduled at the end of 2023. The project team has conducted preliminary studies on 40-60Ktpa capacity production. Process flows are to be optimized for higher lithium recovery and production.
Lakkor Tso Lithium Salar in Tibet, China 2.14 million tonnes (average lithium ion concentration at 270 mg/L) Phase 1 is designed to produce 20Ktpa of lithium carbonate, and the combined output will grow to 50Ktpa after Phase 2 is commissioned.
Xiangyuan Hard Rock Lithium Polymetallic Mine in Hunan, China 2.16 million tonnes The designed throughput is 10Mtpa. The mine is expected to produce 60-70Ktpa of LCE from lepidolite ores upon reaching nameplate capacity. The mine will first re-commission the existing 300Ktpa extraction and concentration system.


Power Type Unit of Power Accumulated Results
Reporting Period (Jan-Jun) Same period in 2021 YoY Growth 
Photovoltic power MWH 9,059 1,084 736%
Gravity power (using belt) MWH 8,256 / /
Hydropower MWH 140,361 67,675 107%
Thermopower MWH 55,686 45,144 23%
Total MWH 213,362 113,903 87%
Results History