
-
LocationHunchun City, Yanbian Prefecture, Jilin Province
-
Ownership100%
-
Project statusIn operation
-
Designed capacityCathode copper: 130,000t/a; sulfuric acid: 450,000t/a
-
2020 productionCathode copper: 126,000 tonnes; gold: 4.43 t; sulfuric acid: 432,900 tonnes