
-
LocationLuoyang, Henan Province
-
Ownership70%
-
Project statusIn operation
-
Deposit TypeFracture zone altered-rock type
-
Reserves & resourcesContained gold 36t with grade of 3.98g/t, and silver of 59t with grade of 332.59g/t
-
Mining & Processing methodsUnderground mining + flotation
-
2021 Production1.58 tonnes of mined gold and 34.54 tonnes of mined silver