
-
LocationUrat Back Banner, Bayannur, Inner Mongolia
-
Ownership87.2%
-
Project statusIn operation
-
Designed capacityZinc ingot: 200,000t/a
-
2020 production217,400 tonnes of zinc ingot and 399,500 tonnes of sulfuric acid (by-product)