Heilongjiang Zijin Copper Smelter
Heilongjiang Zijin Copper Smelter
Heilongjiang Zijin Copper Smelter
Heilongjiang Zijin Copper Smelter
  • Location
    Hulan-Ergi District, Qiqihar City, Heilongjiang Province
  • Ownership
    100%
  • Project status
    In operation
  • Designed capacity
    Cathode copper: 150,000t/a; sulfuric acid: 600,000t/a; gold: 3t/a; silver: 50t/a
  • 2020 production
    Cathode copper: 132,000 tonnes; sulfuric acid: 506,800 tonnes; gold(in anode slime): 1.86 tonnes; silver(in anode slime): 56.90 tonnes
Key Operating Indicators for 2021
  • 37.2
    Total assets/100 million yuan
  • 16.8
    Net assets/100 million yuan
  • 109
    Operating income/100 million yuan
  • 2.4
    Net profit/100 million yuan
  • Project Overview
    The smelter operated by Heilongjiang Zijin Copper is a downstream project for the Heilongjiang Duobaoshan Copper Mine.